G. Subgrade: Surface or elevation remaining after completing the trench excavation or, the top surface of a backfill (stone or soil) immediately below the pipe conduit or pipe bedding, as applicable. H. Topsoil: See Section 2.8 – Seeding, Sodding, and Groundcover. I. Trench Borrow (Select): Trench borrow shall consist of approved material
Get a quoteExcavation and backfilling of soil is a very important part of construction process, and care must be taken while excavation in safety perspective. Different soil layers may be encountered while excavation, dewatering may be needed sometimes. These points must be kept in mind to take necessary action during excavation and backfilling.
Get a quoteAmerican States Utility Services 31 20 00 - 6 Excavation, Trenching and Backfilling Revision Date: 11/20/2015 3.3 DEWATERING (if required) A. Contractor shall provide temporary grading to facilitate dewatering and control of surface water. B. Contractor shall monitor dewatering systems continuously.
Get a quoteFind new and used John Deere Crawler Dozers for sale at Fastline. Our database is full of premium farming and utility equipment at competitive prices.
Get a quote02210 - TRENCHING, BACKFILLING AND COMPACTION OF UTILITIES
Get a quoteCHAPTER 2 - TRENCH EXCAVATION AND BACKFILL 2.1 GENERAL This section covers the requirements for trenching and backfilling for underground pipelines. Unless otherwise shown or ordered, pipe shall be laid in an open trench. All incidental clearing, preliminary grading, structure
Get a quoteSection 3010 - Trench Excavation and Backfill 6 Revised: 2014 Edition 2.03 BACKFILL MATERIAL (Continued) Table 3010.03: Class IVA Material Type Soil Group Symbol ASTM D 2487 Description Fine-Grained Soils (inorganic) ML Inorganic silts and very fine sands, rock flour, silty or clayey fine sands, silts with slight plasticity. CL
Get a quotethoroughly compacted in lifts not to exceed 6 inches. (b) Rock in Trench Excavation - Boulders: When boulders are encountered, anything over 5-inch diameter, the Contractor shall remove them from the trench and backfill the void with appropriate material, which shall be thoroughly compacted in lifts not to exceed 6 inches.
Get a quoteEXCAVATION, TRENCHING, AND BACKFILLING FOR UTILITIES. PART 1 - GENERAL. 1.1 Description. 1. Work Included: Excavation and preparation of trenches as shown on the plans and specified herein, backfilling and site restoration. 2. Related Sections: Additional Sections of the Documents which are referenced in this Section include
Get a quoteCITY OF BRAMPTON LANDSCAPE SPECIFICATIONS SECTION 02315- 6 EXCAVATION, TRENCHING & BACKFILLING.11 Where required due to unauthorized over-excavation, correct as follows:.1 Fill under bearing surfaces and footings with concrete specified for footings..2 Fill under other areas with Type 4 fill compacted to minimum
Get a quoteunit price bid for pipe shall include all excavation, trenching and backfilling with the exception of subgrade stabilization material as approved by Owner/Engineer. B.Dewatering: 1. Refer to Section 02530 – Dewatering. C.Trench Excavation: 1. Excavate trenches by open cut method to depth shown on Drawings and necessary to accommodate work. a.
Get a quoteSection 1505 SECTION 1505 15-3 1 2 EXCAVATION, TRENCHING, PIPE LAYING 3 AND BACKFILLING FOR UTILITIES 4 1505-1 DESCRIPTION 5 Perform all excavation, undercut, foundation conditioning, pipe laying, bedding, backfill and 6 pavement, sidewalk and driveway repair necessary for installation of utilities.
Get a quoteUsed crawler loaders for sale in Kentucky, USA. Caterpillar, John Deere, Fiat, Massey Ferguson and more on Machinio.
Get a quote6-3 SECTION 6 EXCAVATING, TRENCHING, AND BACKFILLING FOR SANITARY SEWER CONSTRUCTION 1. SCOPE OF WORK This work shall include the furnishing of all labor, materials, and equipment necessary for the clearance, excavating, trenching and backfilling, all pipe lines constructed on this
Get a quoteBackfill shall be free from discarded construction material and debris. Loose earth free from rocks, broken concrete and frozen chunks shall be placed in the trench in 6-inch (152 mm) layers and tamped in place until the crown of the pipe is covered by …
Get a quoteSECTION 5 - TRENCH BEDDING, BACKFILL & EXCAVATION 5-6 backfilled in accordance with the Utility Owner requirements. Minimum cover over water mains shall be thirty six (36) inches. 5.05.05 Compaction: All compaction shall be by hand-operated, plate-type, vibratory, or other suitable hand-tampers in areas not accessible to larger rollers or
Get a quoteSECTION 02315 TRENCHING AND BACKFILLING FOR PIPING SYSTEMS PART 1 - GENERAL 1.01 WORK INCLUDED A. The work included under this Section consists of excavating, backfilling and compaction as requi red for th e c ons tructi on of the pi ping sys tems as spec ifie d herei n. (S ee Se cti on 023 14 for excavation for structures.) B.
Get a quote11119271 (1) – APRIL 2018 SECTION 02351 - 1 EXCAVATION, BACKFILL, AND TRENCHING SECTION 02351 EXCAVATION, BACKFILL, AND TRENCHING PART 1 GENERAL 1.1 DESCRIPTION A. Work Specified. 1. The CONTRACTOR shall furnish all labor, materials, equipment, and incidentals necessary
Get a quotethoroughly compacted in lifts not to exceed 6 inches. (b) Rock in Trench Excavation - Boulders: When boulders are encountered, anything over 5-inch diameter, the Contractor shall remove them from the trench and backfill the void with appropriate material, which shall be thoroughly compacted in lifts not to exceed 6 inches.
Get a quoteSECTION 1000 Page 1 CITY OF FARGO SPECIFICATIONS REVISED 2015 CITY OF FARGO SPECIFICATIONS EXCAVATION, TRENCHING, AND BACKFILLING FOR UNDERGROUND WORK PART 1 DESCRIPTION OF WORK The terms "Excavation" and "Trenching", either individually or collectively, as used in these
Get a quote